Introduction to the operation and maintenance of gravity-free mixers
2021-09-04 11:06:03
Gravity-free mixer is mainly used for anti-cracking mortar, thermal insulation mortar, bonding mortar, plastering mortar, floor mortar and other dry powder mortar and high-grade putty powder with high mixing uniformity. Concrete admixtures, feeds, chemical powders, food spices and other industries have also been greatly applied. The mixing of raw materials with a particularly large amount of spray and a particularly high viscosity of the material is not suitable for installation and maintenance:
To be installed on a sturdy, level foundation, the installation location should take into account wiring, maintenance,
The convenience of operation. The drive of this machine is chain drive, the chain should be drip oil 2 times per shift, and the chain sag should be adjusted regularly during use, the sag is 30-80mm.
Test machine:
Check whether the fastening parts are tight. The reducer injects 46# mechanical oil to the oil level line, and the chain drops the lubricating oil. After the steering is correct, the test run is started, and there is no vibration or noise in the test machine before the normal production can be fed.
Operation and maintenance 1. The machine is not allowed to start at full load, and the load is strictly controlled within 0.4-0.6. If the material is too heavy, the machine will be fed as well.
2. Reducer: After two weeks of refueling operation, the new oil should be replaced and the internal oil should be flushed. It can be replaced every 3-6 months. If the ambient temperature is high or wet, the replacement time should be shortened properly. The oil storage in the medium speed reducer must maintain the specified oil level. It should not be too much or too little. The venting cap on the base or the flange can be refilled. The oil lubrication is recommended for industrial extreme pressure point oil:
3, bearing: through the grease hole monthly grease injection, using No. 3 molybdenum disulfide lithium rouge.
4, packing seal: If there is powder leakage in the box body, please fix the four bolts on the gland of the stuffing box, so as not to leak, it is not too tight.
5. Replace the chain to ensure that the red line of the sprocket on the two axes is horizontally aligned and must not be misaligned.
6. When powering on the equipment, the two spindles should be operated in the direction of the arrow on the equipment, and should not be reversed.
To be installed on a sturdy, level foundation, the installation location should take into account wiring, maintenance,
The convenience of operation. The drive of this machine is chain drive, the chain should be drip oil 2 times per shift, and the chain sag should be adjusted regularly during use, the sag is 30-80mm.
Test machine:
Check whether the fastening parts are tight. The reducer injects 46# mechanical oil to the oil level line, and the chain drops the lubricating oil. After the steering is correct, the test run is started, and there is no vibration or noise in the test machine before the normal production can be fed.
Operation and maintenance 1. The machine is not allowed to start at full load, and the load is strictly controlled within 0.4-0.6. If the material is too heavy, the machine will be fed as well.
2. Reducer: After two weeks of refueling operation, the new oil should be replaced and the internal oil should be flushed. It can be replaced every 3-6 months. If the ambient temperature is high or wet, the replacement time should be shortened properly. The oil storage in the medium speed reducer must maintain the specified oil level. It should not be too much or too little. The venting cap on the base or the flange can be refilled. The oil lubrication is recommended for industrial extreme pressure point oil:
3, bearing: through the grease hole monthly grease injection, using No. 3 molybdenum disulfide lithium rouge.
4, packing seal: If there is powder leakage in the box body, please fix the four bolts on the gland of the stuffing box, so as not to leak, it is not too tight.
5. Replace the chain to ensure that the red line of the sprocket on the two axes is horizontally aligned and must not be misaligned.
6. When powering on the equipment, the two spindles should be operated in the direction of the arrow on the equipment, and should not be reversed.
Electronics Products,Electronic Parts ,Electronic Component ,Electronic Items
ChangChun E-vida Technology Co.,ltd , https://www.evidatech.com